Operational Guide to AWWA Standard G200: Distribution by Kanwal Oberoi

By Kanwal Oberoi

This consultant is for the implementation of water distribution platforms operation and administration top practices, as set forth in ANSI/AWWA G200 Distribution structures Operations and administration. The advisor may help software managers comprehend the recent criteria.

Show description

Read or Download Operational Guide to AWWA Standard G200: Distribution Systems Operation and Management PDF

Best hydrology books

Creep and Fracture of Ice

This can be the 1st whole account of the physics of the creep and fracture of ice, and their interconnectivity. It investigates the deformation of low-pressure ice, that's basic to glaciers, polar ice sheets and the uppermost zone of icy moons of the outer sun method. The publication discusses ice constitution and its defects, and describes the connection among constitution and mechanical houses.

Nutrient Control Actions for Improving Water Quality in the Mississippi River Basin and Northern Gulf of Mexico

A wide region of coastal waters within the northern Gulf of Mexico reports seasonal stipulations of low degrees of dissolved oxygen, a often called hypoxia. extra discharge of nutrition into the Gulf of Mexico from the Mississippi and Atchafalaya rivers factors nutrient overenrichment within the gulf's coastal waters and stimulates the expansion of enormous algae blooms.

Additional info for Operational Guide to AWWA Standard G200: Distribution Systems Operation and Management

Sample text

3-2 is an example of a master list showing all important documents that are required to be controlled. Title: Master List of Controlled Documents Purpose/Scope: To identify and record a master listing of controlled documents. Instructions:An entry shall be made for each controlled document upon approval and updated thereafier as necessary. Additional entries may be made on a new form or on the Master List of Controlled Documents Continuation Sheet. NOTE: This form may be replicated on a computer or duplicated on a photocopier.

The exam must be taken at an approved location. Time to travel and take the exam will be given. If after the second failed attempt taking the examination, and the deadline for examination has passed, the Associate may be terminated. If the Operator Trainee is unsuccessful in passing the examination, then he or she must reapply to take a follow-up examination. The follow-up exam will be scheduled as soon as possible. If the examination schedule is such that a second examination would be after the specified deadline, then the Company will consider an extension to ensure that each Operator Trainee has at least two attempts to pass the examination.

Other records will be defaced and recycled. Work Completion: The obsolete original document will be stamped “OBSOLETE” and put in the obsolete file in the EMS files or the historical files in the Central files. All other copies will be defaced and put in appropriate recycle bins. The distribution system support technician files the new controlled copy in the appropriate current controlled document file. Questions to Check Progress 1. Does the utility have documented and implemented policies and procedures for adequate control of records?

Download PDF sample

Rated 4.16 of 5 – based on 9 votes